Skip to main content

Prairie Line Trail Phase 2

Final phase of a construction effort to connect the Water Ditch Trail, downtown Tacoma, and the waterfront with a landscaped shared-use path.
prairie line trail sign

Contact

Clara Dubow  
Public Works – Project Manager
(253) 208-4161
cdubow@Tacoma.gov

Button: Your voter-approved 2015 Tacoma Streets Initiative 1 dollars at work

Project Overview

This two-phase project will complete an important link in Tacoma’s non-motorized system, connecting the waterfront to downtown with multiple city and regional trails. Phase 2 will construct a shared-use path in Tacoma’s Brewery District between South 21st and South 25th Streets along the former BNSF rail line commonly referred to as Hood Street, connecting the completed Phase 1 trail at the UWT campus to the existing Water Ditch Trail. Wayfinding, landscaping, retaining walls, lighting, and art are included in the construction of the shared-use path.

Visit the Project Page

A detailed project page is hosted externally.

GO TO PROJECT PAGE