Skip to main content

The growing, processing, researching, selling or delivery of marijuana is subject to state, federal, and city regulations. This page is intended to explain what type of regulations are likely to apply to marijuana-related businesses in the City of Tacoma. The City does not provide any guidance on state and federal regulations so it is highly encouraged that businesses proposing to engage in these activities consult a professional for guidance prior to obtaining permits.

Marijuana Businesses 101

Recreational marijuana is categorized into three uses:

  • Production – The growing and harvesting of marijuana
  • Processing – Packaging marijuana and creation of marijuana infused products
  • Retail – Sale of marijuana products to the general public

*Please note that permitting and approval needs will vary depending on the type of business and the alterations needed for the building.

Certain locations within the City allow these uses, subject to City zoning requirements and 1,000 foot separation requirements from the following uses:

  • Elementary Schools & Secondary Schools
  • Playgrounds
  • Public Parks (500 feet for retail in downtown)
  • Recreation/Community centers & Libraries (500 feet for retail in downtown)
  • Child Care Centers (500 feet for retail in downtown)
  • Game Arcades (500 feet for retail in downtown)
  • Correctional Facilities & Court Houses (500 feet for retail in downtown)
  • Drug Rehabilitation Facilities, Substance Abuse Facilities, & Detoxification Centers (500 feet for retail in downtown)
  • Public Transit Centers (100 feet for retail uses only)

A general map indicating where approved recreational marijuana locations are within the City may be found here.

To verify a specific address, call a City Planner at (253) 591-5030 (select “commercial” project on the phone system) or email zoning@tacoma.gov.

 

Note: These approvals are for the marijuana business holistically

Steps to Getting a Building Permit

If you’re planning to open or modify a marijuana business in an existing building, you may need a building permit before making changes to the property. This applies to marijuana producers, processors, and retailers.

A building (BLDCA) permit may be required if your project involves changes to:

  • Use or occupancy of the building/property;
  • Interior or exterior alterations to the building;
  • Doors, windows, flooring, or walls;
  • Plumbing, drains, electrical wiring or plugs;
  • Mechanical systems, fans, or ventilation;
  • Siding, roof work, paving/gravel, parking restriping; or
  • Implementation of an extraction process.

The sections below provide guidance on getting started, planning your project, and navigating the permitting process.

 

  • Occupancy Groups:
  • F-1* for growing, processing, and packaging (liveload of 125 psf)
  • S-1* for storage of supplies and finished product (liveload of 125 psf)
  • B for office

*If a change of use or occupancy is being proposed and the building includes a fire area exceeding 12,000 square feet, fire sprinklers are required for F-1 and S-1 occupancies. (See IEBC 1012.2, IBC 903.2.4, and 903.2.9)

  • Floor plans should include all walls, plastic covering (if permitted), and fixtures.

Plastic Sheeting must have:

  • A flame spread index of less than 200, and
  • A smoke developed index of less than 450 (UL 723 Class C or better).
  • All other requirements apply such as fire separations, exiting, ADA accessibility, and plumbing facilities.
  • A step-by-step narrative of all processing methods — Specifications of the processing equipment should be included.
  • A Hazardous Materials Inventory Statement (HMIS) (See IFC 5001.5.2)
  • Specifications of carbon dioxide enrichment equipment
  • A seismic evaluation and upgrade could be required with change of occupancy.

Anchorage will need to be considered for lateral loading.

  • Substantial frames/supports are required for lighting.
  • Storage rack design will need to be detailed.

Show the height from the floor to the top of the storage materials.

  • Show all proposed plumbing fixtures (i.e. number and type) with riser diagram.
  • Provide details regarding groundwork, side sewer, and source control.
  • Review Source Control Plan
  • Heating is required for occupied spaces
    (See IBC 1204.1)
    .

Ventilation details, including location of ventilation shafts and output – 0.06 CFM/SF (Cooling Air Flow per Square Foot) is required for warehouses.

  • Insulation envelope must meet requirements for heated spaces (See WAC C402).
  • Show proposed lighting on energy form and add a note “grow lighting – exempt”. (See WAC C405.5.1 Exception #6)
  • ADA Parking, accessible route of travel to the primary use/work areas, restrooms

Quick Links

Additional Resources

  • To verify a specific address, call a City Planner at (253) 591-5030 (select “commercial” project on the phone system) or email zoning@tacoma.gov.

Contact

Planning and Development Services

Tacoma Municipal Building
747 Market Street, Third Floor
Tacoma, WA 98402

Lobby/Walk-in Hours: In-person services are available from 9 a.m. to 1 p.m., Monday through Thursday. Schedule Your Appointment.