Craft Production
Learn about requirements for craft production businesses in Tacoma, including where these businesses are allowed and what permits or approvals may be required.
Craft Production 101
Craft Production is defined in the Tacoma Municipal Code (TMC) as small-scale on-site production and/or assembly of arts, crafts, foods, beverages or other type of product involving the use of small-scale equipment and/or hand tools. The use must also adhere to the following:
- Include a retail/eating/drinking/tasting component that occupies a minimum of 10 percent of usable space, front the street at sidewalk level or have a well-marked and visible entrance at sidewalk level, and remain open to the public.
- Provide screening and/or buffer landscaping of any outdoor storage areas (if allowed) in accordance with TMC 13.06.090.B.
- Operate all production, processing and distribution activities within an enclosed building.
Due to the limited scale of activities and small boutique nature, Craft Production establishments are considered commercial uses per zoning and are compatible with retail sales and service uses. Craft Production includes, but is not limited to ceramic art, glass art, candle-making, custom jewelry manufacture, bakeries, confectionaries, butchers, coffee roasting establishments, and food production and beverage production.
-
Businesses locating within an existing building will need to consider potential building upgrades, such as accessible counters, ramps, or restrooms. See the Tenant Improvement tip sheet. Other questions to consider:
- How old is the building and how was it constructed? What materials were used?
- Is the building going to be used strictly for manufacturing liquor, or is the general public going to be invited into the building on a regular basis for tastings, tours, classes, and/or retail sales?
- If the public will have access to the building, would the occupancy of the building be equal to 50 people or more?
- Would the new craft distillery be more hazardous or intense than the prior use that it is replacing?
- Does the remodeling of the building exceed 50% of the value of the building?
- Would this would require a change occupancy classification of the existing building?
-
Craft Production may involve hazardous materials or equipment. A City Fire Protection Engineer is available at (253) 591-5503 and should be consulted in the early stages of planning. Questions to consider are:
- Does the building have an automatic fire sprinkler system?
- For a craft distillery, if the building does not have an automatic fire sprinkler system, does the amount of alcohol (ethanol – C2H5OH) produced per production batch exceed the Maximum Allowable Quantity which ranges between 30-gallons to 240-gallons of Class IB flammable liquids depending on the actual situation? In general, if the distillery process is a “closed” system as defined by the Fire Code, then you could have up to 60-gallons being processed without a building fire sprinkler system or 120-gallons with one. If the distillery process is an “open” system as defined by the Fire Code, then you could have only up to 30-gallons being processed without a building fire sprinkler system or 60-gallons with one.
- Is the interior of the building divided into separate fire areas?
- Contact a private design professional to help you review the adopted International Fire Code in relation to your proposal to determine the major design criteria and develop a scope of work.
-
Plans for stormwater mitigation and wastewater discharges are reviewed by Environmental Services and they may be reached at 253-591-5030. The following may be applicable to a craft winery, brewery, or distillery:
- All wastewater discharges shall be in compliance with TMC 12.08.
- Pretreatment of some waste streams may be required. If a pretreatment permit is required, the processing time for this permit is about 90 days from receipt of a complete application.
- Depending on materials stored and manufactured at the site, an Accidental Spill Prevention Plan (ASPP) may be required. Spill containment may also be required for certain stored materials.
- Food service establishments shall be evaluated to determine if grease protection is required.
- Dumpster pads will require a drain to the sanitary sewer system if wet wastes are placed in the dumpster.
- Periodic source control inspections of commercial and industrial facilities are conducted by Environmental Services.
-
The Health Department regulates food and beverage production uses. It’s recommended to call (253) 798-6500 or visit www.tpchd.org in the preliminary stages of planning your business.
Pre-Application Request
If you have a floor plan available, you can submit a pre-application request to meet with Planning and Development staff before submitting your permit application. During the meeting, staff can review your preliminary plans and discuss questions about your proposed project.
To request a meeting, follow the instructions in the Pre-application section of the Apply for Permits web page.
- Preliminary site plan, floor plan(s), and exterior building elevations or photos
- Details about the equipment that will be used and any additional desired business operations
Quick Links
- Accela – Permit platform
- Fee Estimator
- Permit Timeline
- Washington State Liquor & Cannabis Board (WSLCB)
- TMap
- Food, Beverage, and Production Businesses (coming soon)
- Grease Interceptors (coming soon)
- Water Line and Discharge (coming soon)
- Parking (coming soon)
- Commercial Alterations and New Construction (coming soon)
Craft Production Contact Information
- City of Tacoma Land Use Planner (253) 591-5030
- Fire Protection engineer (253) 591-5503
- Environmental Services (253) 591-5030
- Tacoma-Pierce County Health Department (253) 798-6500 or visit tpchd.org