Stormwater Site Plan Templates
Below are templates that must be used to help complete the Stormwater Site Plan (SSP) and Construction Stormwater Pollution Plan (SWPP). Use of the templates ensures all components required in an SSP are appropriately provided and appropriately reviewed to ensure compliance with the City of Tacoma Municipal Code and the City’s Phase I Stormwater General Permit.
Note: These templates may be updated from time to time based upon feedback from the development community and internal staff.
The applicant can include their personal headers/footers to identify their business, but the content and layout must stay the same. Any items that are not applicable to a project should remain and stated that those items are not applicable and why.
-
The Stormwater Site Plan Report Template can be used for larger projects that must comply with Minimum Requirements #1-9.
The Construction Stormwater Pollution Prevention Template shall be used for any project requiring a full form SWPPP unless a Construction Stormwater General Permit is required; in those instances, the Washington State Department of Ecology template can be used, but BMPs and language from the 13 Elements of a SWPPP from the City of Tacoma SWMM shall be included. Note: smaller projects below have the SSP/SWPPP combined and would not also have to complete this version.
-
The Combined Stormwater Site Plan and Stormwater Pollution Prevention Plan Short Form Template can be used for smaller projects that are only required to comply with Minimum Requirements #1-5 (and #9 as applicable). Alternatively, the Long Form Templates shall be used.
The Combined Stormwater Site Plan and Stormwater Pollution Prevention Plan Short Form – Associated with Approved SDEV Permit Template shall be used for single-family homes that have an associated SDEV permit that covers multiple lots (such as a plat/short plat). Alternatively, the complete Short Form Template or Long Form Templates shall be used.
-
The Operation and Maintenance Manual Template can be used for any project that must complete an Operation and Maintenance Manual (Minimum Requirement #9). Alternatively, the applicant may create their own Operation and Maintenance Manual, but it must include all required components as defined in the SWMM.
-
The Spill Prevention Plan Template can be used for any project that must complete a spill prevention plan (Minimum Requirement #3 – Source Control).
-
The following tables are referenced in the above short form and long form templates. They are used to help determine which Minimum Requirement apply to a project.
- Thresholds Table – Note this table can be shown on the existing and proposed basin maps in its entirety as an alternative to being stand-alone.
- Receiving Waterbody Table
- Minimum Requirements Required Table
- Cumulative Impacts Table
- Source Control Selection Worksheet
-
Below are infeasibility checklists that shall be used to help determine infeasibility for Minimum Requirement #5 – Onsite Stormwater Management.
- Infeasibility Checklist Instructions
- BMP L601:Â Rain Garden Infeasibility Checklist
- BMP L602:Â Downspout Full Infiltration Infeasibility Checklist
- BMP L603:Â Downspout Dispersion Infeasibility Checklist
- BMP L604:Â Perforated Stubout Connections Infeasibility Checklist
- BMP L611:Â Concentrated Flow Dispersion Infeasibility Checklist
- BMP L612:Â Sheet Flow Dispersion Infeasibility Checklist
- BMP L613:Â Post-Construction Soil Quality and Depth Infeasibility Checklist
- BMP L614:Â Full Dispersion Infeasibility Checklist
- BMP L630:Â Bioretention Infeasibility Checklist
- BMP L633:Â Permeable Pavement Infeasibility Checklist
- BMP T1050: Compost-Amended Vegetated Filter Strip (CAVFS) Infeasibility Checklist
-
Below are worksheets that can be used for helping determine appropriate sizing for various stormwater BMPs.
- BMP L601: Rain Garden Sizing Sheet
- BMP L602.a: Downspout Infiltration Trench Sizing Sheet
- BMP L602.b: Downspout Drywell Sizing Sheet
- BMP L603.a: Downspout Dispersion – Dispersion Trench Sizing Sheet
- BMP L603.b: Downspout Dispersion – Splashblocks Sizing Sheet
- BMP L604: Perforated Stub-Out Connection Sizing Sheet
- BMP L611: Concentrated Flow Dispersion Sizing Sheet
- BMP L612: Sheet Flow Dispersion Sizing Sheet
- BMP T1050: Compost-Amended Vegetated Filter Strip (CAVFS) Sizing Sheet
Below is a link to the Construction Stormwater Pollution Prevention BMPs in various formats for use when completing the SWPPP and Combined SSP/SWPPP Templates.
SWMM Vol. 3 BMPs (Word, PDF, JPEG)
Construction SWPPP Report Template (Jul 2021) -
The below short forms and infeasibility checklists are applicable to previous SWMM versions – they cannot be used for the 2021 SWMM.
Previous Short Forms
Previous Infeasibility Checklists
Below are infeasibility checklists applicable to previous SWMM versions that can be used to help determine feasibility for Minimum Requirement #5 (Onsite Stormwater Management) – they cannot be used for the 2021 SWMM. Complete the appropriate forms for your project and include the forms as an attachment to the Stormwater Site Plan.
- Infeasibility Checklist Instructions
- BMP L601:Â Rain Garden Infeasibility Checklist
BMP L602:Â Downspout Full Infiltration Infeasibility Checklist
BMP L603:Â Downspout Dispersion Infeasibility Checklist
BMP L604:Â Perforated Stubout Connections Infeasibility Checklist
BMP L611:Â Concentrated Flow Dispersion Infeasibility Checklist
BMP L612:Â Sheet Flow Dispersion Infeasibility Checklist
BMP L613:Â Post-Construction Soil Quality and Depth Infeasibility Checklist
BMP L614:Â Full Dispersion Infeasibility Checklist
BMP L630:Â Bioretention Infeasibility Checklist
BMP L633:Â Permeable Pavement Infeasibility Checklist
Questions/Comments
For questions about City of Tacoma permits, please visit tacomapermits.org.
For suggestions to improve the templates, please email swmupdates@tacoma.gov or contact Mieke Hoppin at (253) 502-2105 or mhoppin@tacoma.gov.