South Cedar Street Active Transportation Improvements
Construction effort to improve infrastructure for multimodal transportation along South Cedar Street.
Contact
Veronicah Munyao
Public Works – Project Manager
(253) 325-1152
vmunyao@tacoma.gov
Project Overview
This project consists of marked crosswalk, pedestrian crossing advance stop bars, rectangular rapid flashing beacons, lane width reduction, road reconfiguration, median channelization/turn restrictions, ADA curb ramp retrofits, audible pedestrian signal, bicycle wayfinding (signs and markings), buffered bike lanes, green pavement markings, one-way or two-way protected bike lane, sidewalk with curb and buffer, pedestrian countdown signal, bike signal detection, bike box, and engineering investigation re: speed limit & bike ramp.
Visit the Project Page
A detailed project page is hosted externally.
LEARN MORE