Utility Connection Permits
Learn about utility connection permits and the requirements that may apply to your project. This page will help you understand when a permit may be required, explore available permit options, and find additional resources to help you plan your project.
Utility Connection Permitting 101
-
Surfacewater (STORM): Connection to City stormwater system or installation of a stormwater facility.
Wastewater (SEWER): Connection for side sewer, grease interceptor, floor drains, toilets, sinks, dumpster pads, oil/water separators.
Water (WATER): Connection (from the meter to the building) for domestic or commercial water service.
Permits to connect from the water main to the meter are issued by Tacoma Water, at Tacoma Public Utilities. Please contact them at mytpu.org arba (253) 502-8247.
PASTABA: Separate permits are required for utility work within the right-of-way.
Papildomi ištekliai
Select a resource below to learn more about permit requirements or your specific utility connection project.
Nuorodos
- Accela – Leidimų platforma
- Mokesčių skaičiuotojas
- Leidimų išdavimo tvarkaraštis
Surinkę visą reikiamą informaciją savo projektui, galite kreiptis dėl leidimo.
Prašyti leidimo