Utility Connection Permits
Learn about utility connection permits and the requirements that may apply to your project. This page will help you understand when a permit may be required, explore available permit options, and find additional resources to help you plan your project.
Utility Connection Permitting 101
-
Surfacewater (STORM): Connection to City stormwater system or installation of a stormwater facility.
Wastewater (SEWER): Connection for side sewer, grease interceptor, floor drains, toilets, sinks, dumpster pads, oil/water separators.
Water (WATER): Connection (from the meter to the building) for domestic or commercial water service.
Permits to connect from the water main to the meter are issued by Tacoma Water, at Tacoma Public Utilities. Please contact them at mytpu.org və ya (253) 502-8247.
QEYD: Separate permits are required for utility work within the right-of-way.
Ek Kompüter
Select a resource below to learn more about permit requirements or your specific utility connection project.
Tez Links
- Accela – İcazə platforması
- Ödəniş Təxminçisi
- İcazə Xronologiyası
Layihəniz üçün lazım olan məlumatları topladıqdan sonra icazə üçün müraciət etməyə hazırsınız.
İcazə üçün müraciət edin